By the YOYO Kitchen Remodel Team ยท 8-minute read
| Project Type | Pre-Construction | Construction | Total |
|---|---|---|---|
| Cosmetic Refresh Paint, hardware, backsplash, countertops | 1โ2 weeks | 1โ2 weeks | 2โ4 weeks |
| Minor Remodel New countertops, flooring, appliances, sink | 2โ3 weeks | 2โ3 weeks | 4โ6 weeks |
| Mid-Range Remodel New cabinets, countertops, flooring, lighting | 3โ5 weeks | 4โ6 weeks | 7โ11 weeks |
| Full Gut Renovation Custom cabinetry, structural changes, all trades | 4โ8 weeks | 6โ12 weeks | 10โ20 weeks |
Before construction starts, you'll finalize your kitchen design, cabinet layout, countertop material, flooring, appliances, and lighting. This phase includes:
At YOYO Kitchen Remodel, this phase typically takes 1โ2 weeks for straightforward projects. Custom kitchen designs with many material decisions can take 3โ4 weeks.
This is the phase that surprises most homeowners, and the main reason a kitchen remodel can't always start the week after you sign a contract.
Permits: If your project requires permits (structural changes, electrical, plumbing), California city permit processing times range from 1 week (over-the-counter permits in some cities) to 6+ weeks for complex structural permits. Fresno and Bakersfield typically have faster processing than Oakland or Anaheim.
Custom Cabinets: Semi-custom cabinets typically arrive in 3โ5 weeks after order. Custom cabinets can take 6โ12 weeks. Stock cabinets are available immediately. This is often the critical-path item for mid-range and high-end kitchens.
Countertops: Quartz and granite countertops are templated after cabinets are installed, then fabricated and installed. Add 1โ2 weeks after cabinet installation.
Existing cabinets, countertops, flooring, and sometimes walls come down. This is the fastest phase, and the most visually dramatic. Most kitchens can be fully demolished in 1โ2 days.
If your project includes electrical upgrades, new plumbing, or HVAC changes, this happens after demolition and before any cabinets go in. Inspection by the city building department typically happens at the end of this phase. Inspection scheduling can add 2โ7 days depending on the city.
Cabinet installation is skilled, detailed work, typically 3 days for a standard kitchen, up to a week for large kitchens or custom cabinetry with complex configurations.
Once cabinets are in place, the countertop fabricator templates (measures precisely) and then fabricates your countertops. Add 7โ14 days from template to final installation.
Backsplash tile, flooring installation, painting, trim work, and hardware installation happen in sequence. Tile grout needs 24โ48 hours of cure time before grouting, and grout sealing adds another day.
Final hookup of sink, faucet, dishwasher, range, refrigerator, range hood, and any other appliances. Final inspections if required by permit.
Your project manager walks the kitchen with you, noting any items for correction. Our crew addresses all items and performs a thorough final clean.
Call YOYO Kitchen Remodel, we give you an honest timeline estimate over the phone, specific to your project scope and city.